690 MW + Battery Gemini Solar

Panorama managed the preparation of 26 technical studies and prepared the NEPA EIS under the Las Vegas Field Office of the BLM for the Gemini Solar Project. The project is the largest solar-plus-battery storage project in the U.S., and the NEPA study area encompassed over 10,000 acres of undisturbed desert landscape. The project also required […]

SGD&E Sycamore to Penasquitos 230 kV Project

The project involved construction and installation of a new 230 kilovolt transmission line between Sycamore Substation and Peñasquitos Substation in the City of San Diego, California. The project was proposed by San Diego Gas & Electric to alleviate bulk electrical system constraints that resulted from the unanticipated early retirement of the San Onofre Nuclear Generating […]

SDG&E Salt Creek Substation Project

San Diego Gas & Electric proposed a 69/12-kV substation and a new 5-mile-long 69-kV electric power line in the City of Chula Vista and San Diego County, California. The project was needed to address new residential and commercial load in the Chula Vista area. Panorama reviewed the PEA, conducted community scoping, and initially prepared an […]

SCE Riverside Transmission Reliability Project (230 kV)

The Riverside Transmission Reliability Project was jointly proposed by Southern California Edison and the City of Riverside to increase electrical reliability within the City of Riverside by providing a second interconnection point into the bulk power system. Southern California Edison’s portion of the project involved construction and operation of a 10-mile long, double-circuit 230-kV transmission […]