Crazy Horse Canyon Switching Station
The project included construction of a new switching station and reconfiguration of two existing associated power lines. The project is located in Monterey County and
PG&E Fulton to Fitch Mountain Reconductoring Project (60kV and 230kV)
PG&E reinforced the electric transmission system in central Sonoma County by replacing the conductor on a 9.9-mile-long section of the Fulton-Hopland 60 kilovolt power line
20 MW Patua Solar
Panorama prepared a Major Special Use Permit (MSUP) application for submittal to Churchill County, NV, for a 20-MW solar plant that would provide station load
350MW Soda Mountain Solar Project
Panorama provided environmental and permitting support to develop a 350-MW solar project in San Bernardino County, California. The project includes multiple solar array areas, operations
690 MW + Battery Gemini Solar
Panorama managed the preparation of 26 technical studies and prepared the NEPA EIS under the Las Vegas Field Office of the BLM for the Gemini
SGD&E Sycamore to Penasquitos 230 kV Project
The project involved construction and installation of a new 230 kilovolt transmission line between Sycamore Substation and Peñasquitos Substation in the City of San Diego,
SDG&E Salt Creek Substation Project
San Diego Gas & Electric proposed a 69/12-kV substation and a new 5-mile-long 69-kV electric power line in the City of Chula Vista and San
SCE Riverside Transmission Reliability Project (230 kV)
The Riverside Transmission Reliability Project was jointly proposed by Southern California Edison and the City of Riverside to increase electrical reliability within the City of