Blog
Windstar Construction Monitoring, Western Wind
The Panorama team (formerly as RMT, Inc) prepared a mitigation monitoring program for the construction phases of the Western Wind Energy Windstar Project near Tehachapi,
Viento Verde de Santa Isabel Wind Farm Project EIS, Puerto Rico
The Panorama team (formerly as RMT, Inc.) assisted the developer in preparing the EIS for the Viento Verde de Santa Isabel Wind Farm Project. The
Sand Canyon Wind Development Project, Kern County, California
Panorama (formerly as RMT) was hired by a private developer to assist them through the early phases of project planning and development for the permitting
Saint Lucia
The Government of Saint Lucia is planning exploration and development of geothermal resources in the Soufriere region of the country. The geothermal exploration is being
Oregon Institute of Technology
Panorama prepared an EA for a proposed 1.2-MW geothermal power plant, a 3,000- to 6,000-foot-deep geothermal well, and a pipeline connecting the new well and
Bottle Rock Geothermal
Panorama prepared a Petition to Amend (PTA) for proposed modifications to the Bottle Rock Power Plant for the plant’s Application for Certification (AFC) with CEC.
Hell’s Kitchen Power + Lithium
Panorama prepared the Imperial County Conditional Use Permit application and technical studies for the Hell’s Kitchen PoewrCo 1 and LithiumCo 1 Projects. The projects include
Patua Geothermal Phase I and Phase II
Panorama prepared the EA for Phase I and the subsequent EA for Phase II of a geothermal development project near Fernley, Nevada. Panorama also prepared
5MW Duffel Solar Project
Panorama assisted East Bay Municipal Utility District (EBMUD) with the siting of a 5-MW solar facility within their watershed lands. Panorama conducted an evaluation of