Blog
Walker Basin Water Transaction
Panorama defined the water transfer program, prepared the General Plan Amendment and policies, and worked with a biological and wetland specialists to identify sensitive biological
New River Improvement Project
The New River Improvement Project – Calexico Reach is a public health project that will divert contaminated New River flows around the populated City of
Coso Hay Ranch
Panorama prepared an EIR for a groundwater pumping project located near Coso Junction, California. The Coso Operating Company, LLC, was seeking a 30-year Conditional Use
Montara Public Works Plan EIR
Panorama prepared the Montara Water and Sanitary District Public Works Plan EIR, which addressed multi-faceted improvements to the Montara Water and Sanitary District’s water system.
Southeast Outfall Replacement Project
The project involves replacing the portion of the Southeast Outfall Force Main that crosses Islais Creek in the Bayview/Hunter’s Point neighborhood, immediately parallel to, and
EBMUD Sobrante Water Treatment Plant Upgrades
East Bay Municipal Utility District is proposing improvements to the Sobrante Water Treatment facility in Contra Costa County. The project includes upgrades to the facility
EBMUD Alameda to Bay Farm Island Pipeline Crossings Project
Panorama prepared an EIR for the construction and operation of three water distribution pipelines (24-inch inner diameter) that would be installed between Oakland and Alameda
Valley Water Dam Maintenance Program
Panorama completed the Program EIR for the maintenance of all 14 dam facilities owned by the Santa Clara Valley Water District (SCVWD). Our team conducted
Wild Goose Gas Storage Expansion Project
The project included the expansion of a natural gas storage field that also included construction of 25.5 miles of gas pipeline traversing three counties. Panorama